名词解释:a bill of lading
A bill of lading I san instrument issued by an ocean carrier to a shipper with whom the carrier has entered into a contract for the carriage of goods.
暂无解析
The policeman came up to the lonely house with the door _______, _______ there for a while and then entered it.
______ is recognized as the national flag-carrier.
The challenge is not one of expansion. _______, the rapid growth in enrollment over the last 40 years has come to an end.
According to the shipping _____ it will be impossible for us to ship the goods in October.()
Please make sure that the stipulations in the L/C are ______ exact accorda nee ___ the terms of the Sales Con tract.
施工项目质量控制的对策是什么?
描述TCP/IP实现中的窗口操作。
背景:
某高层办公楼工程,框架剪力墙结构,共24层,三层以下为性混凝土结构,顶层局部为网架架构。26施工内容包括结构工程、装饰装修工程,给排水、暖通、电气工程和室外工程施工等2007年3月1日开工,2008年4月28日主体结构封顶。
问题:
1、该工程主体结构验收应包括哪些分部工程?
2、其中混凝土结构子分部工程施工质量验收合格应符合哪些规定?
3、规范要求哪些部位进行结构实体检测?任何组织?包含哪些内容?
网络工程是一项复杂的系统工程,一般可分为网络需求分析、网络规划、网络设计、工程实施、系统测试验收和运行维护等几个阶段。网络规划是在需求分析的基础上,进行系统可行性分析和论证,以确定网络总体方案。网络规划阶段任务完成之后转入下一阶段,即网络设计阶段。【问题1】简述网络规划阶段需求分析的方法和解决的问题。
数据库应用系统功能设计包括哪两个方面?每个方面主要由哪些设计步骤组成?
背景:
某综合商务大厦为框架—剪力墙结构,是一座现代化的智能型建筑,设计使用年限50年。该箭镞地下3层,地上28层,建筑面积5.8万平方米。该工程2007年8月10日主题结构验收合格,2008年3月20日施工单位提交竣工验收报告,2008年4月2日竣工验收合格。
问题:
1、该工程建设工程承包单位应何时提交质量保修书?
2、该工程质量保修书应明确哪些内容?在正常使用条件下,建设工程的最低保修年限为多少?
3、写出本单位工程各分项的保修期具体起止日期?
简述计算机通信网络的定义及其功能。
请简述Python中类方法、实例方法、静态方法各自的区别?并简述它们各自的用途。
Alpha测试与beta测试的区别。
什么是数据库的安全性?