某市博览中心机电工程由某安装公司以EPC合同总承包,合同约定,工期为2年,合同价为固定总价。机电工程中的一些主要设备由业主指定供货商,其中空调工程的冷水机组等设备,业主指定了某国厂商的产品。安装公司及时向厂商进行了产品询价,得知设备从订货、运输到施工现场最少需要6 个月,故安装公司及时与该厂商的国内代理签订了设备供货合同。工程施工到6个月后,因该国的政局不稳定,冷水机组等设备延期60 天到达我国口岸,所以冷水机组等设备在通关时,未经商检就直接运到施工现场。安装公司组织本公司人员对设备进行了开箱验收。因设备晚到60 天,安装公司调整了施工进度计划,增加施工人员和机械设备,加班加点,冷水机组等设备按原计划安装到位,通电试运行并验收合格。由于安装公司因赶工期增加了费用支出,向业主提出费用索赔,被业主拒绝。
问题:
1. 根据背景,说明安装公司中标的工程项目包含哪些承包内容?
2. 冷水机组到达施工现场如何进行开箱验收?
3. 针对背景中的风险,安装公司在订立设备采购合同时应采取什么对策?
4. 指出安装公司向业主提出索赔被拒绝的理由。
某水库枢纽工程有主坝、副坝、溢洪道、电站及灌溉引水隧洞等建筑物组成,水库总库容 5.84x108m3,电站装机容量6.0MW,主坝为粘土心墙土石坝最大坝高90.3 米,灌溉引水洞引水 流量 45m3/s,溢洪道控制段共5 孔,每孔净宽 15 米,程施工过程中发生如下
事件:
事件一:为加强工程施工安全生产管理,根据《水利工程施工安全管理导则》 (SL721-2015 )第 14 页 共 21 页等有关 规定,项目法人组织制定了安全目标管理制度,安全设施“三同时”管理制度等多项安全生产管理制度并对施工单位安全生产许可证,三类人员安全生产考核合格证及特种作业人员持证上岗等情况进行核查。
事件二:工程开工前,施工单位根据《水电水利工程施工重大危险源辨识及评价导则》(DL/T5274~2012),对各单位工程的重大危险源分别进行了辨识和评价,通过作业条件危险性评价,部分单位工程危险性大小值及事故可能造成的人员伤亡,数量和财产损失情况如下:
主坝: 危险性大小值 D 为 240 ,可能造成 10 ~20 人死亡,直接经济损失,2000~3000万元, 副坝:危险性大小值 D 为 120 ,可能造成 1 ~2 人死亡,直接经济损失,200~300万元, 溢洪道:危险性大小值D 为 270 ,可能造成 3 ~5 人死亡,直接经济损失,300~400 万 引水洞: 危险性大小值 D 为 540 ,可能造成 1 ~2 人死亡, 直接经济损失, 1000~1500 万元
事件三:电站基坑开挖前,施工单位编制了施工措施计划部分内容如下:
(1)施工用电有系统电网接入,现场安装变压器一台;
(2)基坑采用明挖施工,开挖深度95 米,下部岩石采用爆破作业,规定每次装药量不得大于 50kg ,雷 雨天气禁止爆破作业;
(3)电站厂房墩墙采用落地式式钢管脚手架施工,墩墙最大高度26m ;
(4)混凝土浇筑采用,塔式起重机进行垂直运输,每次混凝土运输量不超过6m3,并要求风力超过 7 级暂停施工。
【问题】
1. 指出本水库枢纽工程的等别、电站主要建筑物和临时建筑物的级别,以及本工程施工项目负责人应具有的建造师级别。
2. 根据《水利工程建设安全生产管理规定》(水利部令第 26 号)和《水利工程施正安全管理导 则》(SL721-2015 ),说明事件一中“三类人员”和“三同时”所代表的具体内容。
3. 根据《水电水利工程施工重大危险源辨识及评价导则》(DL/T5274-2012 ),依据事故可能造成人员伤亡数量及财产损失情况,重大危险源共划分为几级?根据事件二的评价结果分别说明主坝、副坝、溢洪道、引水洞单位工程的重大危险源级别。
4. 根据《水电水利工程施工重大危险源辨识及评价导则》(DL/T5274-2012 ),在事件三涉及的生产、施工作业中,宜列入重大危险源重点评价对象的有哪些?
什么是企业退休人员社会化管理服务?
Part IV Translation
The captain realized that the men tried to deceive him so he made them work very hard for the rest of the voyage. (Passage One)
线路停电检修时发电厂和变电所内应做好哪些安全措施?
某大型水电站工地, 施工单位 A在重力坝浇筑过程中,管理人员只在作业现场的危险区悬挂了警示牌,夜间施工时,却发生了高空坠落死亡3人的事故。工程建设期间,还时常发生当地群众到建设管理单位及施工工地大量聚集事件。当工程某隐蔽部位的一道工序施工结束,在未通知监理人员到场检验的情况下,为赶施工进度,项目经理就紧接着指挥完成下道工序的浇筑。
【问题】
(1)A单位施工安全考核能否通过?为什么 ?
(2)A单位在完成隐蔽工程后,在未通知监理人员到场检查的情况下,能否将隐蔽部位覆盖以进行下一道工序的施工?为什么 ?
(3)施工单位遇到大量群众到施工现场阻扰施工事件时,应如何处理?
某新建单线铁路工程设计行车速度为160km/h,全长 189km,其中简支 T 梁有 360孔,设计为跨区间无缝线路,站线铺轨28km,沿线有十多家石料场,其中铺轨与架梁由一个工程局公司总承包,接轨站位于繁忙的铁路干线上,站内有大量平地。
问题:
1. 选择铺架方案,并加以解释。
2. 建设单位要求 7 个月完成铺架,请确定有关施工进度。
3. 简述跨区间无缝线路施工方案与施工步序。
4. 简述该工程铺架施工应投入的主要机械设备。
Part I Reading Comprehension
Passage 1
Questions 1 to 5 are based on the following passage:
In Washington D.C., 1600 Pennsylvania Avenue is a very special address. It is the address of the White House, the home of the president of the United States.
Originally the White House was gray and was called the Presidential Palace. It was built from 1792 to 1800. at this time, the city of Washington itself was being built; it was to be the nation’s new capital city. George Washington, the first president, and Pierre Charles L’Enfant, a French engineer, chose the place for the new city. L’Enfant then planned they city. The president’s home was an important part of the plan.
A contest was held to pick a design for the president’s home. An architect named James Hoban won. He designed a large three-story house of gray stone.
President Washington never lived in the President Palace. The first president to live there was John Adams, the second president of the United States, and his wife Mrs. Adams did not really like hew new house. In her letters, she often complained about the cold. Fifty fireplaces were not enough to keep the house warm!
In 1812 the United States and Britain went to war. In 1814 the British invaded Washington. Theu burned many buildings, including the Presidential Palace.
After the war James Hoban, the original architect, partially rebuilt the president’s homes. To cover the marks of the fire, the building was painted white. Before long it became known as the White House.
The White House is one of the most popular tourist attractions in the United States. Every year more than 1.5 million visitors go through the five rooms that are open to the public.
1. The White House was built in Washington .
A. because a French engineer was invited to design it
B. because President George Washington liked to live in it
C. because the British invaders lived in it in 1812-1814
D. because it was to be the nation’s capital city
2. The Presidential Palace was .
A. painted gray and white B. made of gray stone
C. made of white stone D. made very warm in winter
3. The president’s home and the city of Washington were .
A. built by the American army B. built by the British troops
C. planned by George Washington D. planned by the French
4. The original home of the president needed to be rebuilt .
A. because John Adam’s wife did not like it
B. because it was cold in winter even with 50 fireplaces
C. because it had burned down during the war
D. because George Washington was not willing to live in it
5. The new presidential home was painted white to .
A. cover the marks of fire B. attract tourist from France
C. to please Mrs. John Adams D. keep it warm in winter
翻译训练:普通话与方言
中国土地广阔,人口众多。尽管全国都讲汉语,但是不同地区的人说汉语的方式不同,这被称为方言。方言一般被称为地方话,是汉语在不同地区的分支,只在特定地区使用。汉语方言非常复杂。它们有以下三方面不同:发音、词汇和语法。发音的区别最为显著。2000多年前,中国人发现社交时应该使用统一的语言。和方言相比,普通话(mandarin)能被所有人理解。普通话有利于不同种族、地区人民之间的信息传递和文化交流。
“三类人员”指那些人员,分别需持什么证?